Ice638: 95:5 by volume ice I:MPCH

T = 190 K, P = 50 MPa, s = 15 mV step (1)
T = 190 K, P = 50 MPa, s = 12 mV step (2)
T = 190 K, P = 50 MPa, s = 9 mV step (3)
T = 200 K, P = 50 MPa, s = 3 mV step (4)
T = 200 K, P = 50 MPa, s = 6 mV step (5)
T = 200 K, P = 50 MPa, s = 9 mV step (6)
T = 200 K, P = 50 MPa, s = 7.5 mV step (7)
T = 200 K, P = 50 MPa, s = 12 mV step (8)

After compaction, before deformation.

Legend: Upper graph of each pair is motor speed V (proportional to edot); lower graph is load (in volts). Translate motor V to edot thus: V1.00 =5.7e-6/s = 2%/hr. W.A.G. load to stress translation for ice638 is roughly 1.5 MPa/mV, with a ~4 mV zero offset. Horizontal scale is time. 5000≈14 hrs.

     
  2106 hrs 2/15/11. Step (8).
  1926 hrs 2/15/11. Step (7).
  1717 hrs 2/15/11. Step (6).
  1540 hrs 2/15/11. Step (5).
  2105 hrs 2/14/11. End step (4).
  0734 hrs 2/14/11. Start step (4).
  2303 hrs 2/12/11. Step (3).
  1722 hrs 2/12/11. Step (2).
  1540 hrs 2/12/11. Step (1).